China manufacturer China Industry Skate Wheel/Flow Rail for Conveyor Roller (GA-01) supplier

Solution Description

China Industry Skate Wheel for Conveyor Roller (GA-01)

Product Characteristics:

1. Used in the curve or confluence element of the conveyor method, could also used as guardrail or guidebook.

two. Modest dimension and light-weight bodyweight.

three. Basic stryture, operating efficiently

4. Accord ing to diverse software setting, it has the alternative of metal or plastic produced.

five. Some could understand 90 change of merchandise.

six. The bottom of goods need to be flat and rigid.

 

Code d(mm) d1(mm) D(mm) W(mm) W1(mm) Static load(kg) Dynamic load(kg) Fat(g)
GA-01 eight.one twelve 48.five 16 18 forty sixty 35
GA-01-A 8.one 12 38 fourteen.3 eighteen 35 fifty 26
    

    Material:608 ZZ+POM or Stomach muscles

    Color: white,yellow,grey,batch purchase more than 10000 only,the colours can be specified by customer 

Code d(mm) d1(mm) D(mm) W(mm) W1(mm) Static load(kg) Dynamic load(kg) Weight(g)
GA-02 8.1 12 48.5 sixteen 18 forty 60 30
    

    Material:608 ZZ+POM or Abs

    Color:batch order more than ten thousand only,the colours can be specified by customer 

 

Code d(mm) d1(mm) D(mm) W(mm) W1(mm) Static load(kg) Dynamic load(kg) Fat(g)
GB-01 6.5 twelve.5 38.five thirteen 20.six 8 ten 56
GB-02A 8.1 12.five forty nine 16 twenty.six eight 15 sixty six
GB-02B 6.five 12.five 49.2 fourteen.2 24 35 45 one hundred and five
    

    Material:galvanized metal surface 

 

Code d(mm) D(mm) W(mm) W1(mm) Static load(kg) Dynamic load(kg) Bodyweight(g)
GD-01A Φ 8.three Φ fifty one sixteen.7 20 eight ten 29
GD-02A Φ twelve.three Φ 51 sixteen.5 twenty.5 eight ten 27
GD-01B Φ 10.three Φ fifty one 16.7 16.7 8 ten 27
GD-01C Φ 13.1 Φ fifty one sixteen.3 sixteen.three eight ten 26
GD-01D Φ ten.three Φ fifty one 16.7 26.3 8 10 thirty
GD-02 Φ 12.7 Φ 51 sixteen.3 16.3 eight ten 25
GD-02E Φ 6.2 Φ fifty one sixteen.5 sixteen.five eight 10 26
GD-03A Φ ten.1 Φ 40 15.3 15.3 8 ten 10
GD-03AT Φ ten.3 Φ forty fifteen 25 eight 10 fifteen
GD-03C Φ ten.one Φ 30 12.two twelve.two eight ten 7
    

    Material:POM + nylon

    Color: yellow,batch get far more than 10000 only,the colours can be specified by customer

OUR Scorching Merchandise

Certificate

OUR Manufacturing facility & ADVANCED Equipment & CONVEYORS

Quick Supply&Swift PAYMENT Technique

FAQ:

one) Can we get your free of charge samples?
Of course, it is ok. Our Samples are free for the consumers. But the freight for express is on buyer’s account.

two)How prolonged to get the sample?
After you pay out the freight charge and send out us verified information, the samples will be all set for shipping and delivery in 3-7 days. The samples will be sent to you via categorical and get there in 3~5 times.

three) Can we merge numerous things dimensions in one particular container in my very first get?
Of course, it is okay. But the amount of every single purchased merchandise need to reach the MOQ for path buy.

4) What is the typical direct time ?
A. For inventory products, we will ship products to you inside of 7-ten function days right after we get the deposit.
B. For mass production, the shipping time is 25-28 times following we received the deposit
C.For OEM merchandise, the supply time is thirty-35 work times after we receive the deposit.

five) What is your payment time period?
T/T 30% superior before manufacturing,70% stability payment before shipping and delivery

six) What is your shipping way?
We will support you to select the ideal transport way in accordance to your depth requirements.
By sea, by air, or by convey delivery, etc.

7)How lengthy to get the sample?
Following you pay out the freight demand and send us confirmed data files, the samples will be prepared for shipping and delivery in 3-7 days. The samples will be despatched to you by way of categorical and get there in 3~5 days.

8)How is your bundle?
Normally packed with wooden drums and cartons, other methods can be done according you.

Welcome to cooperate with us . We would like to give our distributor/agent promotion price tag as reward for the cooperation. If you are fascinated, make sure you do not wait to contact us!
 

The equipment ratio of the worm equipment established is decided by dividing the quantity of enamel of the equipment by the quantity of threads. Consequently, one thread yields larger ratios than multithreading. All ep worm equipment bushings have still left or right thread. ep worm equipment sets are available in one, double, triple and quadruple threads.

China manufacturer China Industry Skate Wheel/Flow Rail for Conveyor Roller (GA-01)     supplier